NOTICE  TO BIDDERS


NOTICE OF TAKING OF BIDS FOR THE CONSTRUCTION OF THE PHASE VI UPSTREAM AND DOWNSTREAM TIE-OFFS WITH RAILROAD CLOSURES FOR THE CITY OF BURLINGTON, IOWA.

Sealed proposals will be received  by the City Clerk of the City of Burlington,  Iowa, in the office  of the City Clerk at the City Hall, 400 Washington  Street, Burlington,  Iowa, until 2:00 P.M. on   the 25th day of August, 2020 for the construction of the Phase VI Upstream and Downstream Tie-Offs  With Railroad  Closures,  as described  in the plans and specifications therefor, now on file in the office of the City Clerk.  Proposals will be opened and the amount of the bids   announced  in said Council Chambers  by the City Clerk at the time and date specified   above.

Also, at 6:30 P.M. on the 31st day of August, 2020, the City Council of said City will, in the  Council Chambers, or at such time, date and place as then may be fixed, act upon proposals to designate the apparent low bidder. The City Council will defer entering into a contract for the construction  of said  improvements  until concurrence  is received  by other governmental agencies.

The location of the work to be done and the kinds and sizes of materials proposed to be used are as follows:

PHASE VI UPSTREAM AND DOWNSTREAM TIE-OFFS WITH RAILROAD CLOSURES

Construct  Phase  VI Upstream  and Downstream  Tie-Offs  With Railroad  Closures  including all labor, materials and equipment necessary for approximately 26,800 cubic feet of concrete foundation with steel tie-back rods, 11,160 linear feet of H piles, 14,200 square feet of sheet pile, 8,850 cubic feet of concrete wall, 3,825 square feet of demountable floodwall system,     325 lineal feet of 30-inch ductile iron pipe force main sewer, 85 lineal feet of bore and jacked 30-inch ductile iron pipe sanitary  sewer, site restoration  (asphalt, concrete, curb and gutter,   unit paving),  seed,  general  demolition,  sitework  and  miscellaneous  associated  work, including cleanup.

All work and materials are to be in accordance with the proposed plans, specifications, form of contract and estimate of cost now on file in the office of the City Clerk of said City, and by this reference made a part thereof as though fully set out and incorporated herein.

All proposals and bids in connection therewith shall be submitted to the City Clerk of said City   on or before the time herein set for said receipt of bids. All proposals shall be made on official bidding blanks furnished by the City, and any alterations in the official form of proposal will entitle the Council, at its option, to reject the proposal involved from consideration. Each  proposal shall be sealed  and plainly  identified.

Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied by bid security, as follows: a certified or cashier’s check, drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to ten percent (10%) of the bid, or a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa in a penal sum often percent (10%) of the bid.

The bid security should be made payable to the CITY OF BURLINGTON, IOWA. The bid security must not contain any conditions either in the body or as an endorsement thereon.  The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within 10 days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and the other contract documents. Bidders will use the bid bond form included in the specifications.

The award of the contract will be made to the lowest responsible bidder submitting the lowest responsive bid, which shall be determined without regard to state or local law whereby   preference is given on factors other than the amount of the bid. The City may select the lowest responsible  bidder after determining  if alternate  bid item is  included.

The City reserves the right to reject any and all bids, to waive informalities and technicalities and to enter into such contract as it shall deem for the best interest of the City.

The City reserves the right to defer acceptance of any proposal for a period not to exceed sixty (60) calendar days from the date of hearing.

On the basis of the bids received, the City Council may propose award for the contract. Final award will not be made until the proposed award is approved by the Department of Natural Resources  of the State of Iowa.   It is anticipated  that such approval will  be made within  thirty

(30) days after application for approval of the proposed award. No claims for compensable delay shall arise as the result of delay  in the approval  of  award.

The successful bidder will be required to furnish bonds in an amount equal to one hundred percent (100%) of the contract price, said bonds to be issued by responsible surety approved by the City Council and listed in the U.S. Treasury Department’s most current list (Circular 570, as amended) and authorized to transact business in the State of Iowa and shall guarantee (1) the faithful performance of the contract and the terms and conditions therein contained, (2) the prompt payment to all persons, firms, subcontractors and corporations furnishing materials for or performing labor in the prosecution of the work, and (3) the maintenance of improvements in good repair for not less than two (2) years from the time of acceptance of the improvements by the City.

The work under the contract shall commence within ten (10) days after date set forth in written Notice to Proceed.  It is anticipated that the Notice To Proceed will be issued  September 14,    2020. All foundation, concrete wall, demountable wall (including railroad closures), and 30-inch ductile iron pipe force main shall be complete and operational and certified as substantially  complete  by June 30, 2021.

Liquidated damages in the amount of One Thousand Dollars ($1,000.00) per calendar day will be assessed for each calendar day that all substantially complete work on the project shall remain uncompleted after June 30, 2021, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Final completion  will include all site restoration  and cleanup and shall  be complete by August 31, 2021.  Liquidated  damages in the amount of   Five Hundred Dollars ($500.00) per calendar day will be assessed for each calendar day that all  work, including site restoration  and  cleanup,  remains  uncompleted  after August 31, 2021, with the allowance for extension of the contract period due to conditions beyond the control of the Contractor.

Payment of the cost of said project will be made from any one or a combination of the following sources at the sole discretion of the City Council: (1) cash to be derived from the proceeds of the issuance and sale of Sewer Revenue Bonds, which will be payable solely and only out of the    future net revenues  of the Municipal  Sewage Utility, and/or from such other cash funds on hand   of said Utility as may be lawfully  used for said purpose; (2) cash derived from the proceeds of     the issuance and sale of General  Obligation  Bonds of said City; (3) cash from such general funds  of said City as may be legally used for such   purpose.

At least ten (10) days before each progress payment falls due (but not more often than once a month), the Contractor will submit to the Engineer a partial payment estimate filled out and signed by the Contractor covering the work performed during the period covered by the partial payment estimate and supported  by such data as the Engineer may reasonably  require. If payment is requested on the basis of materials and equipment not incorporated in the work but delivered and suitably stored at or near the site, the partial payment estimate shall also be accompanied  by such supporting  data, satisfactory to the Owner,  as will establish the Owner’s  title to the  material and equipment  and protect his interest therein,  including applicable   insurance.  The Engineer will, within fifteen (15) days after receipt of each partial payment  estimate, either indicate in writing his approval of payment  and present the partial payment  estimate to the Owner, or return the partial payment estimate to the Contractor indicating in    writing his reasons for refusing to approve payment. In the  latter case, the Contractor may make  the necessary  corrections and resubmit the partial payment estimate.  The Owner will, within   thirty (30) days of presentation to him of an approved partial payment estimate, pay the    Contractor a progress payment on the basis of the approved  partial payment estimate.   The   Owner shall retain five (5) percent of the amount of each payment until final completion and acceptance  of all work covered  by the contract  documents.

A sales tax exemption certificate will be available for all materials purchased for incorporation in  the project.

The request for payment may also include an allowance for the cost of such major materials and equipment which are suitably stored either at or near the site.

Prior to substantial completion, the Owner, with the approval of the Engineer and with the concurrence of the Contractor, may use any completed or substantially completed portions of the work.      Such use shall not constitute an acceptance of such portions of the work.

The Owner shall have the right to enter the premises for the purpose of doing work not covered   by the contract documents. This provision shall not be construed  as relieving the Contractor of  the sole responsibility for the care and protection of the work, or the restoration of any damaged work except such as may  be caused  by agents or employees of the Owner.

Upon completion and acceptance of the work, the Engineer shall issue a certificate that the work has been accepted by him under the conditions of the contract documents. Final payment will be made not less than thirty-one (31) days after completion of the work and acceptance by the City subject to the conditions and in accordance with the provisions of Chapter 573 of the Code of   Iowa.

The Contractor  will indemnify and save the Owner or the Owner’s agents harmless from all    claims growing out of the lawful demands of subcontractors, laborers, workmen, mechanics, material men, and furnishers of machinery and parts thereof, equipment, tools, and all supplies, incurred in the furtherance of the performance  of the work.  The Contractor shall furnish satisfactory  evidence that all obligations of the nature designated  above have been paid,  discharged, or waived. If the Contractor fails to do so the Owner may, after having notified the Contractor, either pay unpaid bills or withhold from the Contractor’s  unpaid compensation  a sum  of money deemed reasonably sufficient to pay any and all such lawful claims until satisfactory evidence is furnished that all liabilities have been fully discharged whereupon payment to the Contractor shall be resumed, in accordance with the terms of the contract documents, but in no  event shall the provisions  of this sentence  be construed to impose any obligations  upon the   Owner to either the Contractor, his Surety, or any third party. In paying any unpaid bills of the Contractor, any payment so made by the Owner shall be considered as a payment made under the contract documents by the Owner to the Contractor and the Owner shall not be liable to the Contractor for any such payments  made in good  faith.

Plans and specifications governing the construction of the proposed improvements, and also the prior proceedings of the City Council referring to and defining said proposed improvements are hereby made a part of this notice and the proposed contract by reference and the proposed   contract shall  be executed  in compliance therewith.

Contract Documents: Drawings and specifications governing the construction of the proposed improvements have been prepared by Veenstra & Kimm, Inc., 3000 Westown Parkway, West Des Moines, Iowa 50266. The Contract Documents may be examined at the office of the City Clerk and may be obtained from the City’s website at the following address: www.burlingtoniowa.org  /2497/upcoming -lettings .

A non-mandatory prebid meeting will be held on the 18th day of August, 2020, at 10:30 a.m. at the City Hall Council  Chambers, 400 Washington  Street, Burlington,  Iowa  52601.

 This notice is given by order of the Council of the City of Burlington, Iowa

John D. Billups, Mayor

ATTEST:

Jim Ferneau,  City Manager